Check 1
How are module model, batch and colour/calibration groups labelled?

Published factory record of an LED module finished-goods storage area.
Storage conditions, lot identification, inventory rotation and project allocations should be confirmed for the specific module and order.
Use the source image as a starting point, then connect the factory review to the product specification and inspection plan.
How are module model, batch and colour/calibration groups labelled?
What storage and handling controls apply before assembly or shipment?
How are modules allocated and counted for a project?
Agree which photos, test results, packing records and pre-shipment checks will be provided for the order.
Send the product, quantity, project locations and inspection requirements so the proposed scope can be clarified.