Check 1
Map the pictured area to the current production flow.

Published factory record of an LED display workshop area.
Use the image as an overview reference and confirm the present workflow, equipment and quality controls during project review.
Use the source image as a starting point, then connect the factory review to the product specification and inspection plan.
Map the pictured area to the current production flow.
Confirm product identification and in-process inspection points.
Request evidence relevant to the proposed display configuration.
Agree which photos, test results, packing records and pre-shipment checks will be provided for the order.
Send the product, quantity, project locations and inspection requirements so the proposed scope can be clarified.